Huntingdon District Council engaged with the Remark Group following a successful tender bid. Remark were required to design and undertake the installation of electrical lighting to the 3G pitch as the aged lighting was past economical repair.
Remark located suitable lifting equipment that would not only provide the correct working height safely but also was able to access the site itself with the tight access.
Remark engaged with Kingfisher lighting and processed a design for the lighting that would match the guidance from Sport England for the pitches. As part of the design Remark where able to reduce the energy usage of existing system from 16 KWs to just 4KWs saving the client in the region of £1,500 a year on energy usage alone.
To ensure the collect spread of light to the pitch Remark engineered a fixing to the existing columns allowing the lights to be suitably secured along with a safety wire should maintenance ever be required.
Commercial Electrical & Network Infrastructure for VentfiltersRus’ New Warehouse
Sep 4, 2026
Improving Speech Privacy at Community Network Services
Jul 30, 2026
Quai Digital Office Technology Case Study
AV
—
Nov 11, 2025
Cost of poor Wi-Fi for businesses & what you can do about it
Nov 1, 2025
Improve your large meeting space to create impact
To improve the sound quality in new or existing auditoriums, contact our audio experts today.